AREVA T&D PLANT STRUCTUREL STEEL STRENGTHENING DESIGNS AND CONSTRUCTION
Location :
TURKEY, KOCAELI - GEBZE
Client :
AREVA T&D
Completion :
2009
Scope
The project, the contract for which was signed in 2009, consists of structurel steel strengthening of Areva T&D Plant that produce 300 - 500 MWA Hıgh-voltage Tranformers (750 ton).
- Structurel steel strengthening static analysis
- Structurel steel designs
- Engineering and detail projects
- Construction of the structurel steel strengthening of the plant
- Crain loads are increased from 120 ton to 350 ton.
- Safety