SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
  • SHIPYARD SHIP SHED CONSTRUCTION PHASE 1
Location :
TURKEY, ISTANBUL - TUZLA
Client :
RMK MARINE - ARK
Completion :
2009
Scope
The project, the contract for which was signed in 2008, consists of demolishing the old buildings and the construction of shipyard ship shed which has the dimensions 100,00 m x 35,00 m., height 19,00 m. and all the civil infrastructural works.
  • Construction Management
  • Engineering and detail projects
  • Reinforced concrete construction
  • Safety
  • Civil infrastructural works
  • Procurement
  • Industrial Flooring
  • Earthworks and excavations
  • Concrete embeds, leveling plates, base plates, beam bearing plates and joist bearing plates
  • Retaining wall and security fence design and construction
Copyright © 2010 Yonar Corporation